| |
 |
|
|
| |
OCCUPANCY LOAD |
| FACTORIES, INDUSTRIAL PLANTS |
| |
|
|
| SPACES |
NOTES |
OCCUPANCY LOAD (m2/person) |
| |
|
|
| Reception Area |
|
3.0 |
| Lobby/Corridors |
non-simultaneous |
------- |
| Waiting Area/Visitors Lounge |
|
3 |
| |
|
|
| Admin Office |
|
10 |
| Meeting/Seminar Room |
|
1.5 |
| Library |
Stack Area |
10.0 |
| Reading Area |
5.0 |
| |
|
|
| Workshop |
|
10 |
| Laboratories |
|
5.0 |
| Exhibition |
|
1.5 |
| |
|
|
| Production Area |
Automated or Not. |
10 |
| Packing /Disturbition Area |
|
10 |
| Storage Area |
|
30 |
| General Storage |
non-simultaneous |
---------- |
| |
|
|
| Staff Rest Room |
non-simultaneous |
30 |
| Staff Cafeteria /Canteen |
|
1.5 |
| |
|
|
| Shops |
|
5 |
| Toilets /Changing/Locker Room |
non-simultaneous |
--------- |
|
Sick Room |
non-simultaneous |
------- |
| |
|
|
| Mechanical Plant Room |
|
30 |
| Roof access for maintenance only |
|
----------- |
| Roof garden/roof terrace |
|
1.5 |
| |
|
|
|
|
| |
|
|
|
|